Initial Environmental Examination of Construction of LPG Bottling, Filling and Storage Plant

Narrative Description of Project:

The objective of this project is to construct an LPG Bottling, Filling and Storage plant of 100 metric tons capacity. This LPG plant is basically a packaging factory which will receive LPG in large tankers and measures them into smaller containers for easy distribution to homes, hospitals, schools and commercial areas. LPG is highly flammable gas and can form explosive mixtures when mixed in the correct proportion with air. It is, therefore, necessary that filling or handling of LPG should be done the properly designed environment. This LPG plant ensures the safe filling and storage of LPG in cylinders of various sizes

Name of Client: M/s Lajpal Traders (Private) Limited

Year: 2018

Location Within Country: Mandara, Tehsil Gujjar Khan, District Rawalpindi

Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved:

  • Engr. Saadat Ali, Environmental Engineer and Team Leader
  • Engr. Ali Abduallh, Enviro-Civil Engineer
  • Mr. M. Wajahat Saeed, Environmental Engineer
  • Ms. Iram Sifat, Environmental Engineer

Description of Actual Services Provided by Staff:

The services included:

  • Collected Baseline (Physical, Biological and Socio-economic) of the project area
  • Identified and assessed of all major and minor impacts during Pre- construction, Construction and Operation phases of the Project;
  • Identified all significant impacts that may require detailed assessment;
  • Proposed mitigation measures to minimize, eliminate or to compensate the potential adverse impacts identified.
  • Prepared Environmental Mitigation and Monitoring Plan
  • Prepared Plantation Plan.
  • Prepared Initial Environmental Examination Report of the project