Description: The total length of the project is 248 m and is comprised of construction of 8×31 spans 814 ft. and two ramps, 115 m towards sadder and 100 m towards Faizabad side of Murree Road Rawalpindi. The overall width of the 3-Lane carriageway for the bridge approaches will be 70 m. The estimated cost of the project is Rs. 873.85 million and will be completed in 120 days.
Client: EA consulting (Pvt.) Ltd
Location: Rawalpindi
Year: 2012